Hainan Jhono Industry and Trade Co., Ltd.
we are specialized in roll forming machine, sandwich panel machine, Metal exterior wall decoration panel machine, MGO wave tile machine, fiber cement board production line. Running brand Chenxing, Jingjing, Jhono..
Select Language
English
Home Sandwich panel machine

wall and roof EPS sandwich panel production line

Browse Categories
Contact Us
Mr. Vecent
Haikou city, Hainan Province, China
I am Online Chat Now
Mr. Vecent(Businesss manager) Mr. Vecent(Businesss manager)

wall and roof EPS sandwich panel production line

Product Details:
Place of Origin: Jiangsu
Certification: ISO9001,CE
Model Number: xmf-2
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: 50000USD
Delivery Time: 90days
Payment Terms: T/T
Description

 

Sandwich panel Production line xmf-2

Quotation & Technical Specification         

wall and roof EPS sandwich panel production line

wall and roof EPS sandwich panel production linewall and roof EPS sandwich panel production line

 

A The Main item.

 

The capacity of the sandwich panel XMF-2 is 1000m-1500m per day (8 hours)

1, The total amount price of above equipment is FOB Shanghai.

2, The electrical installation parts of the machine is used with CE approved material.

3, We offer 1 years warranty period for all of our machine.

4, Our services will include factory process designing, equipment Installation coaching, testing, commissioning and training for your operation staffs.

5, we provide the whole series of Chinese specification and English Reference books.

 

About the Sandwich panel production plant:

  1. The workshop needs to be about 1000m3-1500m2;
  2. The power supply needs to be 32 KVA, and 380V/50Hz;
  3. The producers of single shift need to be 8-10 persons.

 

The Total price of XMF-2 is $50,000USD FOB Shanghai.

 

B. Technical Data

 

1. Production of panel line

1.1 EPS H shape wall panel:           1000/1200mm

1.2 tong & groove wall panel of EPS:     950/1150mm

 

wall and roof EPS sandwich panel production line

 

wall and roof EPS sandwich panel production line

2. the panel line include machinery part,electrical control system part and additional machine for panel

  • overall power equipment:20 kw
  • size of the line:overall length of the line is 25000mm,overall width of the line is 4500mm(max),overall height of the line is 2700mm
  • overall weight of the line:~12 t

 

2.1 machinery part

 

2.1.2 Panel machine

type of uncoiled:manual

material of coil:Color coating coil

thickness of coil:

width of coil:0.3-0.8mm

weight of coil: 3 tons

inside diameter of coil:

  • grooving

grooving :in according the design requirement

depth of groove:0.5~1.0mm

  • into shearing

type of shearing:Electrical

numbers of shear:2 sets  (top and bottom each one)

Driven power: 0.75KW

  • glue pump

numbers of pump:4 sets(top and bottom each 2)

driven power:   0.37 kW

flow volume of glue:0 ~0.4 kg per pump

type of flow volume control:Change frequency

scale of glue:(white)1:(Black) 1.5

  • spread uniformly device

speed of spreading:80 times/min

driven power:   0.5kw ×3

  • composite rubber roller

roller diameter:150 mm

thickness of composite rubber layer:10mm

hardness of composite rubber layer:60

number of rollers:26

  • EPS edge cutter

type of cutting:electrical heat cutting

numbers of heater:3

power of heater:2.5kw×6

driven power:0.75kw

  • panel cutter

 

material

type of cutting

driven power

Thickness of panel

Length of panel

EPS

shearing cutter

1.5kw×2

40-300mm

1200~30000mm

 

movement of cutter:1800mm (cylinder distance)

type of operating:touch screen

overall weight of cutter:~ 1.5 t

 

 

C TRANSPORTATION

All goods will be shipped to your country, containers number will be decided with how many machines would you choose

 

D. Installation of the machine

    The individual components of the machine are installed according to the layout and prepared for the commissioning.

The installation comprises of:

-   Installation by Xingmao service technicians.

    -   The following services are included:

    -   Installation of the machine components.

    -   Adjustment of the machine components.

    -   Connection of all motors to the control cabinet.

    -   Installation of the required safety devices.

    Delivery extent does not comprise of:

    -  Media supply (electrics, compressed air, etc.)to the machine(control cabinet)

    -  Raw material,process material and fuels

    -  Raw material for test blocks

    -  Transport and lifting devices

-  Auxiliary staff.

    The operators of the plant should be present during the installation in order to become familiar with the new machines.

 

 

Contact Us
Mr. Vecent
  • 86-898-68614077
  • Haikou city, Hainan Province, China
From:
Enter your Email ID please.
Send your inquiry directly to us
(767/3000)

Get a counter.